From:                              route@monster.com

Sent:                               Saturday, April 16, 2016 2:06 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: NSN Construction Manager

 

This resume has been forwarded to you at the request of Monster User xapeix03

Ricardo Viramontes 

Last updated:  01/07/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Elgin, IL  60123
US

Mobile: 708-989-0717   
Home:
708-989-0717
ricardo_viramontes@yahoo.com
Contact Preference:  Telephone

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Construction Manager

Resume Value: ew6bnsa26jq2q7fz   

  

 

16671 Liberty Circle – Unit 2N                                                                   Phone: (708) 989-0717

Orland Park, IL. 60467                      E-Mail:  Ricardo_Viramontes@yahoo.com

 

Ricardo Viramontes

 

Executive Summary

 

Achieved 8 years of wireless Telecommunications network leadership. Successfully configured, optimized and troubleshot multiple wireless platforms while maintaining key business objectives and deadlines. Strong record of achieving exceptional results with an emphasis on customer satisfaction.

 

Professional Experience

 

2014 - Present                                              IHC Construction                                                Elgin, Illinois

 

Project Engineer

·            Site walk new AT&T LTE 2C and 3C site builds with MasTec CM and annotate any special construction requests

·               Work with MasTec CM/PM to obtain construction site materials, as per BOM and AT&T ERF.

·               Obtain construction material needed from Primus and Electrical Suppliers.

·               Address Punch List corrections in the field when necessary.

·               Train tower Foremen on how to wire AC breakers in the PPC cabinet, BBU Battery Heater Pads and Rectifiers in the field.

·               Red Line all CD’s and RFDS’s post construction to reflect the site build.

·               Review all SCC Closeout files and pictures to ensure all aspects of construction are installed per AT&T ND502 standard.

·               Upload Closeout Package to MasTec database ‘N-Site’ as well as email directly to CM/PM/PC.

·               Review Tape Drop and AAT pictures to make sure all azimuths and mechanical down tilt pictures are as per the CD/RFDS.

·               Generate the Sweep and PIM report based off of raw .DAT and .PIM files, after reviewing to make sure all markers are correct as per frequency.

·               Assist with escalated Tiger Team issues in the field.

·               Assist PM with True-Up

·               Add relevant Drivers and upload relevant photos to the Site Project in ‘N-Site’ to ensure payment accuracy.

·               Develop internal quality control check lists and naming conventions for the Foremen to follow when capturing closeout photos.

 

2013 - 2014                                                NTP Wireless                                                   Chicago, Illinois

 

Solution Lead        

·               Commission/Integrate/troubleshoot Nokia ESMB, ESMC, FSME, and FSMF System Modules and FXFB, FRIG, and FRIE radios

·               Commissioned/Integrated/Call Tested 50+ T-Mobile Cell sites

·               Assist construction crews with interpreting complex site designs involving Diplexers, Hybrid Combiners, Mast Head Amplifiers etc.

·               Prep/sweep Andrew Quad-Pole antennas for T-Mobile site builds and prepare sweep report to submit to client

·               Install/connect Alcatel-Lucent 7705 router

·               Troubleshoot and repair T-Mobile Tiger Team trouble ticket issues

·               Mentor other Tiger Team technicians as the Lead Tiger Team Tech, and address more complex trouble tickets when necessary

·               Maintain Tiger Team spares inventory, and fill out RMA’s for defective components

·               Address Punch List Items per T-Mobile and NSN standards

·               Interview ‘BTS Integrator’ candidates, and make recommendations to Construction Director

·               Construction Managed an AT&T Passive DAS installation project at the Experian Building in Schaumburg, IL

·               Installed Telect racks, and mounted all AT&T mobility components, (i.e. Ericsson LTE RRU, 6601, 6602 Nodes) as per standard

·               Run Plenum rated RF coax through the ceiling to antenna location as per RF engineering blue prints, and put N-Type Commscope connectors on ½” coax

·               Coordinate and acquire material and components needed to complete project

·               Coordinate rental of Summitek PIM equipment and PIM tested all RF components/antennas at Experian DAS project

 

 

2012 – 2012                                                 FMHC Corporation                                                Chicago, Illinois

 

Field Supervisor

 

·               Commissioned/Integrated  30+  T-Mobile Sites as part of the NSN Modernization Project and completed related “Part B” closeout packages

·               Train/mentor colleagues and GC’s and assist with RFDS site configuration questions/issues as the Lead Integrator

·               Troubleshoot FXFB, FSME, and ESMB related Commissioning issues

·               Completed 43 T-Mobile Site Surveys for the NSN Modernization Project

·               Ensure quality control checks on visited cell sites, and red flag any punch list items to the site Construction Manager

 

 

2010 – 2012                                             Goodman Networks                                            Schaumburg, Illinois

Field Technician

 

·     Responsible for scheduling work for Field Technicians in the group and updating the AT&T CTS ticketing system with status and/or closure

·     Trained Field Tech’s how to use Siterra, for purposes of uploading close-out documents and site photos in accordance with customer specifications

·     Coordinated all field work with general contractors including T1 extensions, Civil work, and provided direction with any market standards questions

·     Coordinated an Ethernet To The Cell Site (ETTCS) project with AT&T, Century-Link, and Frontier LEC’s, on behalf of AT&T Mobility to deliver fiber circuits to specific cell sites

·     Created red-line drawings on site-layout blue-prints using Adobe to indicate what civil work was required, based on the site configuration/requirements

·     Tested, extended, troubleshot T1 voice circuits from the LEC demark to AT&T Mobility BTS (Ericsson 3206/UMTS and 2206/GSM)

·     Extended and terminated 25-pr Icky Pick cable between Hoffman cabinets and installed liquid-tight whips as needed

·     Traveled to Fort Wayne, Indiana to perform PIM and Return-Loss Sweep tests on Andrew and/or Powerwave antennas for AT&T Mobility

·     Submitted screen shots and Excel spreadsheets with pass/fail results for each antenna for inventory and return-to-vendor records

·     Proficient with using Summitek iQA-1921B/iQA-850B PIM testers,  Acterna T-Berd 2310 for testing T1 circuits, and Anritsu MS2034A Site Master Analyzer to sweep antennas

 

 

2006 – 2010                               Sprint-Nextel                                                  Bridgeview, Illinois

 

RF Field Technician II

 

·          Responsible for maintaining /repairing 76 CDMA and iDEN cell sites

·          Installed, integrated, programmed, added capacity, troubleshot Motorola BTS 4812 CDMA components

·          Integrated 1st Universal Base Station, (UBS) in Chicago market

·          Installed, wired, programmed, added capacity, troubleshot Motorola EBTS iDEN radios and components

·          In charge of 1 of 6 Chicago-land Fiber Optic backhaul remote node iDEN micro-network host locations (Fiber Hotel.)  

·          Installed and wired iDEN RF Motorola racks with black/red power cables from PECO DC power plant

·          Drive tested cell sites for E-911Phase 1 and Phase 2 compliance and  troubleshot deviant sector performance related to low calls/dropped calls

·          Amongst 1st group of technicians to be trained and integrate WiMAX 4G in Chicago-land in 2007

·          Maintained 100% cell site component inventory accuracy every year

·          Punched down, crimped, troubleshot  AT&T T1 circuits and Fiber Tower fiber circuits

·          Familiar with using  El Gato, Site Master, Fluke Meter, JDSU T-Berd (HST-3000) for troubleshooting day to day cell site problems

·          Towed 50Kw Kohler generators to support cell site/network outages and restore service during disaster recovery

 

 

2004 – 2006                                           Andrew Corporation                                             Orland Park, Illinois

 

Information Systems Technician

 

·          Configured and troubleshot PC hardware and so

·          Installed Linksys routers and configured WEP encrypted wireless networks for end users

·          Recommended and upgraded hardware systems based on future demand for expandability

·          Traveled to a Marietta, Georgia to configure and join an Andrew-acquired company, (American Tower) LAN to the Andrew domain

 

·          Remote controlled user PC’s and upgraded, troubleshot, and performed system maintenance

 

 

 

Education

 

2001–2003                   DeVry University           Tinley Park, IL

 

·          B.A. Telecommunications Management

·          GPA 3.75/4.0, Magna Cum Laude

·          Received over 220 contact hours of lab experience

·          Implemented Cisco Routing commands in a LAN environment

·          Learned DSO, T1, T3, DS-3, OC-3 fundamentals

 

 

Certified Training

·               Andrew Connector certified from Andrew Institute on 4-18-2007

·               Summitek, (Kaelus) Certified on 4-2011

·               Nokia Installation Certified on 7-25-2012

·               Nokia Commissioning and Integration Certified for 2G/3G on 8-20-2012

·               ODM Fiber Tester Certified on 11-2012

·               Nokia Commissioning and Integration Certified for LTE on 3-8-2013

·               OSHA 30hr Safety Certified on 6-30-2013

·               RF Awareness Certified 1-7-2013

·               CPR Certified  on 1-7-2013

·               First Aid Certified on 7-29-2013

·               Anritsu PIM Master Measurement Certified on 6-11-2014

·               CITCA Authorized Climber Certified on 10-1-2014

·               CITCA Tower Rescue/Competent Climber 10-3-2014

 

 

Languages

 

·               Fluent in English

·               Fluent in Spanish



Experience

BACK TO TOP

 

Job Title

Company

Experience

Project Engineer

IHC Construction

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Years of relevant work experience:

5+ to 7 Years

Date of Availability:

Immediately

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Citizenship:

US citizen

 

 

Target Job:

Target Job Title:

Construction Management

 

Target Company:

Company Size:

Occupation:

Installation/Maintenance/Repair

·         Equipment Install/Maintain/Repair

 

Target Locations:

Selected Locations:

US-IL-Chicago South

Relocate:

Yes

Willingness to travel:

Up to 50% travel

 

Languages:

Languages

Proficiency Level

English

Fluent

Spanish

Fluent